Ottawa Carleton Detention Centre – Ottawa, Ontario [NOT IN DRIVE]

Budget: $23,000,000 (Construction), $2,700,000 (Security)

Project Description: A major addition to the existing detention centre which included a maximum security “pod style” unit and support areas. The integrated security system for this maximum security facility consists of 21 sub-systems, such as: Computer Controlled Door Locking and Alarm Reporting Systems, CCTV Systems, Duress Alarm Systems (Active and Passive), Nurse Call System, Perimeter Security Systems, Communications Systems and Fire Alarm System.

Role/Responsibility:

Lobo was the design consultants for the Integrated Security & Communications Systems. Services included: Engineering Design Drawings, Engineering Specifications, Construction Review, Commissioning & Testing, including warranty periods.